|
Care and Usage of CHIMERA Products
Rectangular Lightbank Setup
1. Insert the Poles into Sleeves Match the size of the end of the poles to the holes in the pole blocks of your Speed Ring. Then insert the opposite end of each pole into the pole sleeve openings at the rear of each corner of your Lightbank. Grasp the pole sleeve to keep it straight as you slide the pole fully through the sleeve to the end. Note: Some poles have identical sized ends so it does not matter which end of the pole goes into the sleeve. Other poles have different sized ends and it is important to match them for size to the Speed Ring pole block holes.
2. Insert the Optional Diffusion Baffle Inside the Lightbank
Attach the diffusion baffle to the Velcro™ tabs located next to the pole sleeves inside the Lightbank a few inches from the front opening. Tabs will align properly if CHIMERA label on baffle is facing the front of the Lightbank.
3. Mount the Lightbank on Speed Ring
Determine which direction the Lightbank will be oriented, horizontally or vertically, in relation to the light fixture, subject, etc., (Rotating Rings may be mounted either way of course). If you are using a patented CHIMERA Quick Release™ ring, make sure the pole blocks are in the locked position. Begin with the poles at the top for the top of the ring. Insert the poles, one at a time, into the holes at the corners of the Speed Ring. Make sure the poles are fully inserted into the holes. Poles will become increasingly stiff as you move from one pole to the next. Flex poles as necessary so they slip into holes easier. Gripping the pole diagonally opposite from the pole you are inserting will provide extra leverage.
4. Installing Front Screen (“PLUS” and “PLUS ONE” BANKS ONLY)
Make sure the, CHIMERA label is facing towards the front of the Lightbank. Attach the screen to the Lightbank by aligning the back edge of the Velcro® hook strip on the front screen with the back edge of the Velcro® loop strip on the Lightbank. When installed properly, part of the Lightbank’s loop strip is visible in the Lightbank’s recess, just to the front of the front screen.
Lightbank Take Down
5. Cooling
Provide adequate ventilation for your equipment. Use the lighting instrument’s internal cooling fan if available. When using continuous light sources, keep the top flap open as much as possible. Use upper and lower vents to cool Quartz and Daylight Banks. Always allow the Lightbank to cool before disassembling and placing in storage.
6. Removing the Lightbank from the Speed Ring
If the light is mounted on light stand, start with bottom poles, otherwise, start with any pole. Bend pole slightly towards the rear of the Lightbank to make it easier to slide the pole end out of the hole. Align the pole end with the hole axis and slide pole out using thumb pressure against Speed Ring. Gripping the pole diagonally opposite the pole you are removing will provide extra leverage. If you are using a patented CHIMERA Quick Release™ ring, simply release the locking levers to release to poles tension and then slide the poles from the mounting holes.
7. Folding and Storage
Leave the poles in Lightbank but remove the optional diffusion baffle and front screen. Crease the short sides of the Lightbank and flatten. Fold the Light bank in half once then roll up and slide into the storage sack. Never store a damp or wet Lightbank.
Cleaning
Your CHIMERA Lightbank can be cleaned by hand washing with cold water, a sponge and mild soap. Do not machine wash. To dry, assemble the Lightbank onto a Speed Ring and completely air dry.
If your front screen gets soiled, erect the Lightbank, gently scrub soiled area(s) with a mild solution of soap and water using a natural sponge then let air dry. Do not use abrasive soaps or wash in a washing machine.
Repair
CHIMERA does excellent in-house repairs. Lightbanks need to be clean with any added tape removed before sending in for repair. If the Lightbank is received in dirty or taped condition the repair may be refused and returned to sender. Please call in advance to get a Return Authorization number and repair pricing at 888-444-1812 ext. 101.
Accessories:
We make a complete line of Lighting Modifiers and accessories including; Speed Rings for nearly every lighting fixture currently in use, Panel frames and fabrics, Scrims, Color Correction Screens, Barn Doors, Honeycomb Grids, Fabric Grids, Multi-head set-ups and more. Call or write for a catalog or visit our web site at www.chimeralighting.com
This list of additional front screens is included in case you might like the option of shooting with a less dense front screen. The standard screen reduces the light output by approximately 1 stop. The 1/4 grid screen reduces the light by one-quarter stop, the 1/2 grid screen by one-half stop.
These screens can be purchased through your authorized Chimera dealer or by contacting CHIMERA directly at: Toll-free 888-444-1812, Fax 303-444-8303 or e-mail salesinfo@chimeralighting.com.
|
Size |
Standard |
½ Grid |
¼ Grid |
|
Super PRO Plus, Video PRO Plus, and Daylite Junior Plus Banks |
|
XXS (12” X 16”, 30 X 40cm) |
4100 |
4102 |
4104 |
|
XS (16” X 22”, 40 X 55cm) |
4110 |
4112 |
4114 |
|
Small (24” x 32”, 60 x 80 cm) |
4120 |
4122 |
4124 |
|
Medium (36” x 48”, 90 x 120cm) |
4130 |
4132 |
4134 |
|
Large (54” x 72”, 135 x 180cm) |
4140 |
4142 |
4144 |
|
Small Strip (9” x 36”, 20 x 90cm) |
4150 |
4152 |
4154 |
|
Medium Strip (14” x 56”, 35 x 140cm) |
4160 |
4162 |
4164 |
|
Large Strip (21” x 84”, 50 x 210cm) |
4170 |
4172 |
4174 |
|
Quartz Plus Banks |
|
|
Small (24” x 32”, 60 x 80cm) |
4420 |
4422 |
4424 |
|
Medium (36” x 48”, 90 x 120cm) |
4430 |
4432 |
4434 |
|
Large (54” x 72”, 135 x 180cm) |
4440 |
4442 |
4444 |
|
Daylite Plus Banks |
|
|
Small (24” x 32”, 60 x 80cm) |
4620 |
4622 |
4624 |
|
Medium (36” x 48”, 90 x 120cm) |
4630 |
4632 |
4634 |
|
Large (54” x 72”, 135 x 180cm) |
4640 |
4642 |
4644 |
|